COMMISSIONING
Valves should be installed according to the manufacturers instructions, taking care to commission them exactly as described, setting temperatures according to each individual installation. Settings will vary because of differences in inlet temperature and pressure. Take temperature readings at the normal flowrate after allowing about a minute for the system to stabilise. Any TMV that has been adjusted or serviced must be re-commissioned and retested in accordance with the manufacturer’s instructions. |